Information Technology Services

Switch Code Upgrades in the Data Center & DR Site

From May 21, 2023, 7:30 a.m. to May 21, 2023, 11:30 a.m.

Impact of the change on users:

Servers in rows 3 through 7 in the Data Center and DR site not configured for LACP or dual-connected network connectivity will be hard down during the code installation for approximately 20 minutes.

Reason for the change:

ITS is upgrading the switch code. (ID # 254804)